Before you've finished picturing the solution, we'll show it to you working
With AI we build a prototype on your data fast. You click through it, tell us what to change, and we refine it in short loops until it is ready to go live.
AI works alongside us at every stage of the project
Not long ago an IT project started with weeks of analysis and a thick spec that was out of date before anyone finished reading it. Today AI listens, organises and documents for us, and the team focuses on what takes experience: decisions, architecture and quality.
- 01
Conversations become requirements
After every conversation AI prepares a summary, a list of requirements and the questions still to settle. Nothing gets lost in someone's notes.
- 02
AI knows your company
Processes, documents, terminology and decisions go into a shared project knowledge base. You don't have to explain everything again.
- 03
Works with what you already use
We connect to the tools and data you already have: your ERP or CRM, email, spreadsheets, the company drive. Your team keeps its habits, and the new solution works on your real data from day one.
- 04
A prototype instead of a description
You can click through the first version right at the start of the project, and see your changes in each new version.
- 05
A spec that lives with the project
Every decision and change updates the spec automatically. You always know where things stand, without digging through email.
- 06
Documentation that writes itself
Technical docs and user guides are built as we go, from the code and the decisions. On handover day they are complete and up to date.
- 07
Quality checked twice
AI writes tests and does a first code review, and experienced engineers check every change before it ships.
Six stages, from problem to working system
You come with a problem
Requirements refined with AI
Your company context
A prototype, fast
Spec and docs with AI
Go-live after AI testing
Why we deliver faster now
Weeks of workshops and analysis
Requirements ready after the first conversation
A spec dozens of pages long that is hard to picture
A prototype you can click through
A spec out of date within a month
A spec that updates with every change
A new system sitting next to the old tools
Integration with the tools and data you already use
The first working screen after months of work
A working version early in the project
A late change costs a lot
A change goes into the next loop
Documentation written at the end, if at all
Documentation built as we go
Decisions based on a description
Decisions based on what you can see
You know what you are getting from day one
Talk in your own words
A scope you've already seen
Progress in every version
Changes under control
Fixes during the work
Faster to go-live
What changes after a well-run project
"Before, our team spent hours every week manually pulling data from three different systems to compile a single report. Now it just happens. In the first month after go-live we caught two pricing errors that would have cost us real money."
"I'd had bad experiences with IT projects going over budget and over time. What I appreciated most was that we always knew where things stood. When there was a problem, they told us immediately and proposed a fix."
"Our site managers were tracking project status in spreadsheets sent by email. Now they update everything in one place and I can see the actual status of every project in real time. Sounds basic, but it changed how we run the business."
Describe the problem and we'll show you the solution
Tell us what takes up the most time today. We reply within one business day.
Describe your problem →