The first working version of your system, in weeks
Test the idea in practice before you invest in the full product. We build just enough of the system to make the decision — on code you can extend later.
Why first versions never get built
Most system ideas die between the presentation and the build: scope too big, delivery too slow, or built as a throwaway.
The decision waits for proof
Vendors quote analysis phases
Throwaway prototypes waste the budget
Small scope, a real system
The discipline is in what we cut, not what we add.
Scope cut to the real test
Production-grade build
Interface design included
Senior speed, AI-assisted
Launch and first iterations
Logistics startup, freight matching MVP
The founders wanted a freight exchange for one specific corridor. We cut the scope to a single flow: shipper posts a load, carrier bids, deal closes. Next.js, PostgreSQL, Stripe. The first paying shipper arrived in week six, and the decision to build the full version was made on usage data instead of mockups.
Weeks, mapped out
A typical MVP takes 4 to 10 weeks from kickoff to first users.
Scoping workshop
Design sprint
Build
Launch and iterate
What you get
- A first version in weeks, not quarters
- A decision about the full product made on usage data, not a hunch
- Code you extend instead of throwing away
- A fixed price for a fixed scope
“Every agency pitched us phases and discovery. UDB asked what we needed to prove, then built exactly that.”
Common questions
How much does an MVP cost?
Depends on the flow being tested, but the price is fixed after the scoping workshop, and the typical build is 4 to 10 weeks. You know the number before we start.
What happens if the MVP takes off?
It grows. We build on production foundations (real auth, payments, CI/CD), so scaling means adding features, not rewriting.
We're not technical. Is that a problem?
No. We handle architecture and explain every trade-off in business terms. You make product decisions, we make sure the technical ones don't surprise you later.
Would no-code be cheaper?
Sometimes, and if it fits your test, we'll say so in the workshop. No-code stops paying off when the product needs custom logic, integrations or your own data model.
Have an idea that needs a practical test?
Tell us what the system has to prove. The scoping workshop takes days and ends with a fixed price for the build.
Scope your MVP